Домашняя страница Проекты

Singer Yu Jiayun’s LIve Concert | YZDITEC 41-Point Synchronized Rigging Rental Case

Singer Yu Jiayun’s LIve Concert | YZDITEC 41-Point Synchronized Rigging Rental Case

Apr 14, 2026

41-Point Synchronized Rigging System: Yu Jiayun Live Concert

Concert rigging rental projects rarely throw all the curveballs at once. This one did.
Project Specs: 41 servo hoists | 30-point LED rig (24 m × 24 m) | 5 lighting trusses | 1 art installation | Single-console control
LED rigReal-time position and load monitoring

1.  The Brief

Singer Yu Jiayun's live concert required 41 independent suspension points—each with different load profiles and motion requirements. The centerpiece: a 24 m × 24 m four-sided LED screen suspended from 30 synchronized points. Add lighting trusses (10–20 m), a suspended sphere, and coordinated lift-tilt-stagger choreography throughout the show.

For stage automation teams and rental companies, this multi-point complexity is where traditional manual systems hit their limits.


2.  The Challenge: Precision at Scale

Two non-negotiables drove the rigging system design:

Sync precision — 30 hoists moving a 576 m² LED assembly can't drift by millimeters. Any phase mismatch would twist the structure or trigger emergency stops.

Load stability — Variable payloads across 41 points required independent torque control and real-time monitoring to prevent sway or overspeed during transitions.
LED screen lift

 


3.  The Solution: One Console, 41 Motors, Zero Surprises

We deployed 41 BGV C1-certified servo chain hoists, orchestrated through a single automation console with 3D simulation and offline programming.

Pre-show workflow:

  • Venue mapping and load distribution modeled in 3D simulation
  • All sequences programmed offline and tested virtually
  • Safety limits pre-configured per rigging point

Lighting trusses

Show-night execution:

  • Real-time position and load monitoring across all motors
  • Multi-axis moves triggered from single cue commands
  • Automated safety warnings flagged deviations before they became visible

The entire stage rigging system ran as a unified machine—not 41 individual hoists hoping to stay in sync.

Performance: Tight Moves, Zero Drama

Every programmed sequence executed within spec. The LED screen lifted, tilted, and repositioned without drift. No emergency stops. No manual interventions.

For a rental deployment in a live concert environment, that's the standard we build to.

stage rigging system


4.  Technical Backbone

Servo Chain Hoists:

  • BGV C1 safety certification (third-party verified for entertainment rigging)
  • Closed-loop servo control with absolute encoder feedback
  • Position accuracy to ±1 mm

Control Console:

  • EtherCAT real-time network (sub-millisecond sync)
  • 3D pre-visualization and offline programming
  • Mobile compatibility for wireless monitoring

For the full story, click below to watch the complete video.


Оставить сообщение

Оставить сообщение
Оставьте нам сообщение, и мы ответим вам как можно скорее.
Представлять на рассмотрение
Связаться с нами :ysstagetech@gmail.com

Домашняя страница

Продукция

whatsApp

Контакт